Planned maintenance window for MAX Mail control panel

2012-12-20  The engineering team will be implementing some configuration changes and hardware updates on the servers used for the MAX Mail control panel and the branded site servers.

While some of this can be done without impacting the availability of the control panel, one portion of this work will require bringing the control panel off-line briefly.  Therefore, we are planning a maintenance window for Sunday, January 6, 2013, from approximately 6:30 AM to 8:30 AM Pacific.  We expect that the control panel will be unavailable for approximately 30 minutes during this window.

Mail flow will continue during this time and will not be impacted by this maintenance window.

Thanks for your attention.

This entry was posted in MSP Mail, MSP Mail service updates. Bookmark the permalink.